steam boiler spec - 5 bar fire tube boiler calculation
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
The vertical gas velocity is 3.5 m/s in the afterburner chamber at a thermal load of 25 Gcal/h. The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h.Get Price
Steam consumption for atomizing runs from 1 to 5% of steam produced, usually averaging around 2%. Case history of a 20 gph fire tube hot water boiler As found Reset to specifi- cations draft 0.22" 0.06" CO 2 10.5 13.0 Smoke # 6 2 soot much trace VI BCR* AUTOMATIC "PACKAGED" BOILER This unit is a complete steam or hot water generating Get Price
Steam consumption for atomizing runs from 1 to 5% of steam produced, usually averaging around 2%. Case history of a 20 gph fire tube hot water boiler As found Reset to specifi- cations draft 0.22" 0.06" CO 2 10.5 13.0 Smoke # 6 2 soot much trace VI BCR* AUTOMATIC "PACKAGED" BOILER This unit is a complete steam or hot water generating Get Price
9. Reminders to designers to show all required fire, smoke, radiation and volume control dampers on contract drawings are accented. 10. Boiler breeching was omitted because mechanical codes and other specifications too often override the SMACNA details. 11. Volume damper construction is now more specific. 12.Get Price
9. Reminders to designers to show all required fire, smoke, radiation and volume control dampers on contract drawings are accented. 10. Boiler breeching was omitted because mechanical codes and other specifications too often override the SMACNA details. 11. Volume damper construction is now more specific. 12.Get Price
Steam consumption for atomizing runs from 1 to 5% of steam produced, usually averaging around 2%. Case history of a 20 gph fire tube hot water boiler As found Reset to specifi- cations draft 0.22" 0.06" CO 2 10.5 13.0 Smoke # 6 2 soot much trace VI BCR* AUTOMATIC "PACKAGED" BOILER This unit is a complete steam or hot water generating Get Price
9. Reminders to designers to show all required fire, smoke, radiation and volume control dampers on contract drawings are accented. 10. Boiler breeching was omitted because mechanical codes and other specifications too often override the SMACNA details. 11. Volume damper construction is now more specific. 12.Get Price